Ihveder opened a new well with desalination plant in Rafah – south of Gaza
The plant was set up in a slum whose population depends on the purchase of water appointed out that it took almost a month to work
which the artesian well was dug 95 metres deep
This was concluded in the construction and processing of the plant, which has a capacity of 13,000 litres of fresh water per day
It is worth noting that the United Nations confirmed in its reports issued in 2020 that the water in Gaza Strip is not suitable for human use, and that the salinity rate exceeded 97%